CONSTRUCTION & INFRASTRUCTURE
CONSTRUCTION & INFRASTRUCTURE

MASS RAPID TRANSIT TUNNELING WORK

  • Silence generator units to achieve noise compliance
  • Quick set up and capable for fast relocation if required
  • Power engineering design with complete power solution
  • Transformer for providing higher voltage setting required for operating boring machine
  • Switch gear protection for safety
  • Provision of medium voltage cables and connections
 

DATA CENTRE

Utilisations of load banks to test and discharge battery banks of the Uninterrupted Power Supply (UPS) is frequently conducted.In addition, UPR’s large capacity load banks may also be deployed to test the function of the control system as well as the multi-megawatts of standby generators installed as the backup power source at Data Centre.

GALLERY

Let us help
with your
power needs!
Let us help
with your
power needs!
Let us help
with your
power needs!