MASS RAPID TRANSIT TUNNELING WORK
DATA CENTRE
Utilisations of load banks to test and discharge battery banks of the Uninterrupted Power Supply (UPS) is frequently conducted.In addition, UPR’s large capacity load banks may also be deployed to test the function of the control system as well as the multi-megawatts of standby generators installed as the backup power source at Data Centre.
GALLERY